    1. DATE OF LAYING FOUNDATION OF STONE: 2nd July, 2010 By SRI TAPAN CHAKRABORTY, Hon'ble Minister, Govt. of Tripura, at SBS YH Premises.
    2. Name of The project : SHAHEED BHAGAT SINGH YUBA AWAS (4 STORIED BUILDING)
    • Approved Cost :-  Rs. 1851.00 lakh

    • Fund Released By the Government :- Rs.1665.90 Lakh (Under SPA)

    • Up to Date Expenditure : - Rs.1585.23 lakh.

    • Name of the Implementing Agency :TRIPURA HOUSING & CONSTRUCTION BOARD, AGARTALA.

    • Date of Commencement of Work : 02-07-2010.

    • Time of completion of Work : 24 MONTHS. 

    1. PROVISION OF THE BUILDING

    • GROUND FLOOR 

    • Plinth Area : 1846.00 Sqm.

      • Dining Hall al      := 2 nos (56 persons in each Dining Hall)

      • Conference Hall :-1 no ( 60 persons Sitting Capacity)

      • Staff Rest Room :-2 Nos.

      • Office Room (with attached toilet):- 2 nos.

      • Visitors Waiting Room :- 1 no.

      • Toilet Block     :- 2nos .

      • Kitchen, store, wash room :- 1 no.

      •  Common Toilet Block :-1 no.

      • Stair Case :- 3 nos.

      • Lift Room :- 1 no

    • FIRST FLOOR

    • Plinth Area = 1767.00 Sqm.

      • Dormitory (30 bedded) X 4 Rooms Total :- 120 Nos,Beds.

      • Coaches Room (Double bedded) with attached toilet :- 2 nos

      • Suit: - 2 nos.

      • Office /Store Room  :-1 no.

      • Stair Case : - 3 nos.

      • Toilet Block : - 2 nos.

      • Separate Block of Bath: - 2 nos.

    • SECOND FLOOR

    • Plinth Area = 1767.00 sqm.

      • Dormitory (30 bedded) X 4 Rooms. Total : -120 Nos,Beds

      • Coaches Room (Double Bedded) with attached toilet : - 4 nos

      • Suit : - 2 nos.

      • Office /Store Room : -1 no.

      • Stair case : - 3 nos.

      • Toilet block: - 2 nos.

      • Separate Block of Bath :- 2 nos.​​

    Sahid Bhagat Singh Yuba Awas Photo

     

     

    • THIRD LOOR
    • Plinth Area= 1767.00 Sqm.

      • Dormitory (10 bedded) X 12 Rooms Total :- 120 Nos, Beds

      • VIP Suit :-2 nos.

      • Suit :- 2 nos

      • Office /store Room :-1 no.

      • Stair case:-1 no.

      • Toilet Block :- 2 nos.

      • Separate Block of Bath:- 2 nos

    • There is provision of deep Tube Well with IRP for supply of water to the building.

    • One Circular Road has been constructed around the building.

    • One Circular Road has been constructed around the building.

    • The building is enclosed by a boundary wall of 520.00 mtr. With two Nos. Gates.

    • A covered drain outside the boundary wall has been constructed. Lift Provision (To be Commissioned ) =1 no.

    • Length of Covered Drain: - 520.00 mtr. Length of boundary wall :- 545.00 mtr.